Recent Posts
Recent Comments
- Get free iPhone 14 Pro Max: http://palacecorretoradeseguros.com.br/upload/go.php hs=bbcb4357d14886e02bee3a93d831e2e1* on Oven
- Get free iPhone 14 Pro Max: https://www.orthopaedicum-lich.de/upload/go.php hs=5920634d8171ee6cab62507438b230e9* on Argosy & Arkansas
- Get free iPhone 14 Pro Max: https://krishnaprakashan.com/upload/go.php hs=58168d57fc509b3d167cc8a2cf12d8b5* on Excella Update & Colorado Trip
- Get free iPhone 14 Pro Max: https://www.fabtronics.com/uploaded/go.php hs=008cc16cbd8a58705468a62fa3ee5866* on 1977 Interior Update
- Get free iPhone 14 Pro Max: http://1088.it/uploads/go.php hs=96fb8b5a795fa0e7d665bd848812a105* on Rear Frame Repair & LED Running Lights
Archives
Categories
Tag Archives: 1967 Airstream Sovereign
1967 Maiden Voyage
I am still trying to get caught up, but here is a picture of the first time the ’67 was pulled after the shell-off restoration. This trailer still needs all new insides, but everything else is in incredible shape. The … Continue reading
Weekly Update – ’77 and ’67 Progress
About three weeks ago we decided to do the “bare minimum” to get the ’77 safe and road worth so that we could use it this summer while the ’67 is still a long ways from being ready. The axles … Continue reading
Weekly Update #8 & #9
Things have been very busy lately and thus a very late update on last week’s progress is included in this week’s update. After getting the floor dry fitted we drilled all of the holes for the elevator bolts and then … Continue reading
Weekly Update #7
This past week was spent dry fitting the floor and the shell to the floor. The hoist system made this process as painless as possible. The two most difficult areas were the door and the rear outer curve since both … Continue reading
Weekly Update #6
Last week was a fairly productive week with the frame being coated with POR-15, installed the wheels, repaired the exterior wheel well covers, and worked on dry fitting the floor. Here is a picture of the repaired frame from the … Continue reading
Weekly Update #5
This was a busy week and it feels like a lot happened, but not much visible change to most people. The entire frame was cleaned with a wire wheel and then cleaned using the marine cleaner from POR-15 in preparation … Continue reading
Weekly Update #4
I am off schedule here a little, but we have all been sick here this past week again. Here is a picture of the frame after a first run of cleaning. It cleaned up really nice, but there is still … Continue reading
Mid-Weekly Update #4
I have to do a mid-week report of the progress as we have reached a really big milestone, the removal of the shell! Phil did a great job getting the structure stabilized with a 2×4 structure that kept it 100% … Continue reading
Weekly Update #3
This week has been extremely productive, with lots of changes taking place that we have been looking forward to for some time now. We hired Phil (seen in the pictures working on removing the floor) to work on our project … Continue reading
Weekly Update #2
This update is delayed by two weeks as things have been a little off here lately. Two weeks ago a “blizzard” came through this area of Texas and our city is not setup to deal with 3-5″ of snow and … Continue reading