Monthly Archives: March 2011

Weekly Update #7

This past week was spent dry fitting the floor and the shell to the floor. The hoist system made this process as painless as possible. The two most difficult areas were the door and the rear outer curve since both … Continue reading

Posted in Airstream | Tagged | Leave a comment

Weekly Update #6

Last week was a fairly productive week with the frame being coated with POR-15, installed the wheels, repaired the exterior wheel well covers, and worked on dry fitting the floor. Here is a picture of the repaired frame from the … Continue reading

Posted in Airstream | Tagged | 2 Comments

Weekly Update #5

This was a busy week and it feels like a lot happened, but not much visible change to most people. The entire frame was cleaned with a wire wheel and then cleaned using the marine cleaner from POR-15 in preparation … Continue reading

Posted in Airstream | Tagged | Leave a comment